Aguirre & Fields provided transportation engineering services for traffic control for 1.1 miles of these street and drainage improvements from east of Immanuel Road to west of Cameron Road, ending at the Travis County North East Metro Park. The traffic control plans included a 3-phase scheme and used temporary pavement during construction to remain within existing right-of-way. The design incorporated the installation of permanent pipe and maintained driveway access at all times for adjacent users. The project continued the 2-lane section of Wells Branch Parkway eastward, following a previously dedicated 120’ ROW. Design services included considerations for the ultimate 6-lane arterial.

Our team also provides structural engineering services for water quality/detention pond facilities for this project.